What's happening?
A-one+ on behalf of Highways England will be carrying out resurfacing works at the A27 Grove Lodge.
Traffic Management
In order to carry out these works as efficiently and as safely as possible, there will be full closures in place. Works start on the A27 at Grove Lodge Roundabout on 3 March for three weekends. They will be working from 8pm until 6am
Series of full closures on main carriageway - A27 Grove Lodge Roundabout
The works will be undertaken under temporary traffic signals but Hillbarn Lane and Broadwater Street will be closed with a local diversion route in place.
Dates and timings
Weekend works only 8pm – 6am
3 and 4 March
10 and 11 March
17 and 18 March
The works are located at Grove Lodge roundabout and we will be resurfacing and renewing existing road markings, studs and detector loops
Emergency services will be allowed through our closures at all times
Residents who require access to their properties during the closures at their locations, should keep proof of residence (document with address on) with them to gain entry and access.
Diversions- clearly signed local diversions will be in place during all closures utilising local routes, suitable for all types of vehicles when full closures of the carriageway are in place.
Video above is Cllr Louise Murphy and me announcing the works following our lobbying.